Engineering Consultancy Services for Detailed Engineering


Consultancy Services for Detailed Engineering Services, Survey and preparation of Topographic survey by adopting total station survey for widening to two lane with paved shoulders development of existing road in town (Khed & Narayangaon) where bypasses are provided / being provided, excluding rehabilitation of Bridges on NH-50 in state of Maharashtra on EPC mode.
- Client: National Highway Authority Of India (NHAI)
- Configuration: 2 Lane With Paved Shoulder
- Project Cost: 36.000 Cr.
- Length: 10.05 Km.
Consultancy Services for Detailed Engineering Services, Survey and preparation of topographic by adopting total station survey for widening to two lane with paved shoulders under Hybrid Annuity Hybrid Annuity Package No. PN 52: The improvement of section of State Highway 143 commencing from Km 107/200 to Km 153/420 i.e. the Mayani – Diganchi – Sholapur District Border – Mahud – Korti – Pandharpur section in the State of Maharashtra in HAM mode.
- Client: Public Works Department Maharashtra (PWD, Maharashtra)
- Configuration: 2 Lane With Paved Shoulder
- Project Cost: 152.000 Cr.
- Length: 47.000 Km.
Consultancy Services for Detailed Engineering Services, Survey and preparation of topographic by adopting total station survey for widening to two lane with paved shoulders under Hybrid Annuity Package No. PN 35: Improvement to Ashtavinayak Roads Dist-Pune. (Part V- Narayangaon to Otur Km 55/000 to Km 73/457, BankarPhata to Lenyadri Km 0/000 to Km 11/547, Lenyadri to Ozar Km 0/000 to Km 14/085 and Lenyadri to Ganeshkhind road Km 0/000 to Km 31/026 excluding overlap length of 21.73 Km) section in the State of Maharashtra in HAM mode.
- Client: Public Works Department Maharashtra (PWD, Maharashtra)
- Configuration: 2 Lane With Paved Shoulder
- Project Cost: 163.000 Cr.
- Length: 53.290 Km.
Consultancy Services for Detailed engineering, Survey and preparation of topo by adopting total station survey for widening to two lane with paved shoulders under Hybrid Annuity Package No. PN 53: Improvement to District Border to Mungashi Aran Karkamb Pandharpur Road, MDR-133, km 0/00 to 72/200, District-Solapur (Part- District Border to Pandharpur Km 0/000 to Km 82/300) section in the State of Maharashtra in HAM mode.
- Client: Public Works Department Maharashtra (PWD, Maharashtra)
- Configuration: 2 Lane With Paved Shoulder
- Project Cost: 201.000 Cr.
- Length: 77.490 Km.
Consultancy Services for “Providing the Design Engineering Services for Rehabilitation and Up-Gradation of Existing Highway to 2Lane – 4Lane with Paved Shoulder Configuration from Vita to Nagaj ( Design CH. Km 47+500 to 94+155 ) Section of NH 166E (Guhagar- Bijapur) on EPC Mode in the state of Maharashtra. (For Part Portion)
- Client: Ministry of Road Transport and Highways, NH (PWD)
- Configuration: 2 Lane/4Lane With Paved Shoulder
- Project Cost: 274.000 Cr.
- Length: 46.655 Km.
EPC 26 – Improvement of SH 23 Road from Bari to Ghoti Sinnar Road, Reconstruction, Widening and Strengthening of existing carriageway in the section of SH-23 from Km 191/980 to 205/380 (Length- 13.32 Km) to two lanes with earthen shoulders standards in Tal. Igatpuri Dist. Nashik, Maharashtra on Engineering, Procurement & Construction (EPC) Mode.
- Client: Public Works Department Maharashtra, ADB Funded (PWD, Maharashtra)
- Configuration: 2 Lane With Paved Shoulder
- Project Cost: 90.000 Cr.
- Length: 13.320 Km.
Four/Six laning of Aurangabad to Paithan section of NH-752E from existing Km.0.000 (Design Km (-) 1.800) to existing Km. 44.400 (Design Km. 42.417) (Design Length- 42.217) in the state of Maharashtra to executed on EPC mode under Bharatmala Pariyojana.
- Client: National Highway Authority of India (NHAI)
- Configuration: 4 Lane With Paved Shoulder
- Project Cost: 289.000 Cr.
- Length: 42.417 Km.
Rehabilitation & Up-Gradation to 2-Lanes with Paved Shoulder Configuration of Mahud-Sangola of NH-965G Chainage from km.159.400 to161.900 & 162.400 to183.960 km (Design Chainage from km 32.300 to km34.800 & km35.300 to km56.860) In the State of Maharashtra on EPC Mode Total Length = 24.06 km
- Client: Ministry of Road Transport and Highways, NH (PWD)
- Configuration: 2 Lane With Paved Shoulder
- Project Cost: 130.000 Cr.
- Length: 24.06 Km.
“Design & Construction using Thin White Topping (TWT) including routine maintenance & balance works from Km. 42.000 to Km. 179.946 (Total Length-137.946 Km) in the State of Maharashtra as Standalone project on EPC Mode”
• Client: National Highway Authority of India (NHAI)
• Configuration: 4/6 Lane With Paved Shoulder
• Project Cost: 430.64 Cr.
• Length: 104.136 Km.