Engineering Consultancy Services for Proof checking of 4 laning of Khed Sinner Section NH-50 (New NH-60) comprising of the stretches Kalamb bypass (Km 68/576 to Km.72/390), Linear length of Bhatkalwadi (Km 89/550 to Km 90/400) and Alephata bypass (from Km 92/030 to Km 96/000) (Total length 8.634 Km) of Pune District in the State of Maharashtra on EPC Mode.

 

  • Client: National Highway Authority of India (NHAI)
  • Configuration: 4 Lane With Paved Shoulder
  • Project Cost: 125.000 Cr.
  • Length: 8.634 Km.

Engineering Consultancy Services for Proof checking of  A) Rehabilitation and up gradation of Aurangabad-Sillod-Ajanta-Jalgaon road Ch. Km 47+500 to Km 54+500 (L=7.00 Km) to four lane configuration in the state of Maharashtra on EPC Mode. B) Rehabilitation and up gradation of Aurangabad-Sillod-Ajanta-Jalgaon road Ch. Km 87+700 to Km 89+800 (L=2.10 Km) and Km 144+750 to Km 147+380 (L=2.63 Km) to four lane configuration in the state of Maharashtra on EPC Mode.

 

  • Client: Ministry of Road Transport and Highways, NH (PWD)
  • Configuration: 4 Lane With Paved Shoulder
  • Project Cost: 80.000 Cr.
  • Length: 11.73 Km.

Engineering Consultancy Services for Proof checking Construction of Vehicular underpass @ ch.185+500 to Pune -Nasik road NH-60 in the state of Maharashtra under EPC mode.

 

  • Client: Ministry of Road Transport and Highways, NH (PWD)
  • Configuration: 4 Lane With Paved Shoulder
  • Project Cost: 40.000 Cr.
  • Length: 2.000 Km.

Engineering Consultancy Services for Proof checking of Rehabilitation and Up-gradation of Section Watur to Jintur Road of NH 752 I to Two Lane with paved shoulder configuration on EPC mode in the State of Maharashtra. Package- From Watur (00+000) to Charthana (27+00).

 

  • Client: Ministry of Road Transport and Highways, NH (PWD)
  • Configuration: 2 Lane With Paved Shoulder
  • Project Cost: 110.000 Cr.
  • Length: 27.000 Km.

 

Engineering Consultancy Services for Proof checking of Six-Laning work of Bhandara Bypass (Wainganga Bridge-Bhandara Section) of NH-53 (Old NH-6) from km 485+000 (Design km. 485.000) to km 499+545 (Design km. 499.800) in the State of Maharashtra on EPC Mode.

 

  • Client: National Highway Authority of India (NHAI)
  • Configuration: 6 Lane With Paved Shoulder
  • Project Cost: 421.000 Cr.
  • Length: 16.000 Km.

Engineering Consultancy Services for Proof checking of Up- gradation and Rehabilitation of Exisitng Highway From Parli to Gangakhed  (Km 0/000 to km 30/000) to 2 Lanes with Paved Shoulder/ 4 Lane Configurations Section of NH-361F on EPC mode in the state of Maharashtra. (Length 30.400 Km)

 

  • Client: Ministry of Road Transport and Highways, NH (PWD)
  • Configuration: 2 Lane / 4 Lane With Paved Shoulder
  • Project Cost: 202.980 Cr.
  • Length: 30.400 Km.

 

Engineering Consultancy Services for Proof checking of EPC 11 – Improvement of of MDR 84road NH-9 (Pune-Solapur) to Khadki-Paravadi-shetphalgade-Lakadi-Nimbodi-Bhawani Nagar-Sasar Kurwali, Reconstruction, widening and strngthning of existing carriageway in the section of MDR-84 from km 0/000 to km 21/900 to Two lane with paved shoulders standards in Tal. Indapur Dist Pune Maharashtra on EPC based

 

  • Client: Public Works Department Maharashtra, ADB Funded (PWD, Maharashtra).
  • Configuration: 2 Lane / 4 Lane with Paved Shoulder.
  • Project Cost: 145.830 Cr.